李佳 (Li Jia)

 职称:长聘教轨副教授

 邮箱:j.li@sjtu.edu.cn

 

研究方向

  • 二氧化碳捕集运输与封存利用

  • 生物质燃烧
  • 煤气化

 

教育经历

  • 2005-2010: 英国伦敦帝国理工机械工程博士
  • 2004-2005: 英国华威大学过程工程与工商管理优等硕士
  • 2000-2004: 上海同济大学机械工程学士

 

工作经历

  • 2015 –2018: 英国谢菲尔德大学访问教授
  • 2016 -2018: 英国暗淡蓝点公司亚洲顾问及捕集专家
  • 2015 -2018: 亚洲开发银行广东CCS中心国际专家及组长   
  • 2013 –2015: 英国爱丁堡大学碳捕集与封存讲师
  • 2011 –2013: 英国埃克塞特大学低碳能源讲师

 

科研项目

  • 2017-2019 华润电力海丰测试平台

  • 2017-2019 EU’s Accelerating CCS Technologies (ACT) ACORN Project

  • 2016: EPSRC Opening New Fuels for UK Generation (CO-I) 2015-2017 Guangdong International CCS center, funding from Asian Development Bank 

  • 2014-2016: CO-I of Investigating the Radiative Heat Flux in Small and Large Scale Oxy-Coal Furnaces for CFD Model Development and System Scale Up funded by UKCCSC Call 2

  • 2014-2015: Pre-feasibility Study of 1 Million Ton/year Integrated CCUS Project in Guangdong (Pre-M) funded by UK FCO SPF Fund Guangdong Development and Reform Commission and Scottish Government

  • 2014- 2018: ETP Doctoral Training Funding on Biomass Co-gasification with CCS 

  • 2014-2015: Pre-feasibility design of Carbon Capture and Storage Ready (CCSR) Plant for China Resource Power Haifeng Power Plant’ funded by China Research Power.

  • 2013-2015: EPSRC Gas-FACTS Project: Gas - Future Advanced Capture Technology Options

  • 2013-2014: CO-I of Implementation of Carbon Capture and Storage (ICCUS) in China funded by UK FCO SPF fund

  • 2013-2014: IEAGHG Impurity Scenarios for Carbon Capture Plants

  • 2011: Charter the Way for CCS in Southeast Asia at Asian Development Bank, Philippines

  • 2007 - 2011: Chinese Advance Power Plant Carbon Capture Option (CAPPCCO) project, China 

  • 2007 - 2010: UK-China Near Zero Emissions Coal (NZEC) Project

  • 2009 - 2010: IEA Greenhouse Gas Programme CO2 Capture Retrofitting Study

 

代表性论著

  •   Peer-reviewed Papers   
  1. Yang, X.,  Clements, A., Szuhánszki,J., Huang X.,  Moguel, O., Li,J., Gibbins, J., Liu, Z, Zheng, C., Ingham, D., Nimmo, B., Pourkashanian M.(2018) Prediction of the radiative heat transfer in small and large scale oxy-coal furnaces, Applied Energy, 211, 2018, 523-537.
  2. Abbie Clare, Ya-Qing Gou, Andrew Barnes, Simon Shackley, Thomas Luke Smallman, Wen Wang, Dong Jiang, and Jia Li. (2015) Should China subsidise cofiring to meet its 2020 bioenergy target? --- A spatio-techno-economic analysis. GCB Bioenergy. 8 (3), 2015, 550-560
  3. Ian Wilson, Jia Li (2015) Low Cost Simplified Design of a Two Stage Plug Flow Gasifier. Energy Procedia
  4. Wetenhall, B., Aghajani, H., Chalmers, H., Benson, S.D., Ferrari, M.-C., Li, J., Race, J.M., Singh, P., Davison, J.(2014)Impact of CO2 impurity on CO2 compression, liquefaction and transportation. Energy Procedia, 63, pp. 2764-2778.
  5. Ying Huang, Hongxu Guo, Cuiping Liao, Daiqing Zhao, Di Zhou, Qiang Liu, Xiaochun Li, Xi Liang and Jia Li. (2014) Study of a roadmap for carbon capture and storage development in Guangdong Province, China. International Journal of Sustainable Energy. DOI: 10.1080/14786451.2014.953161
  6. Li, J., Tharakan, P., Macdonald, D., Liang, X (2013) Technological, economic and financial prospects of carbon dioxide capture in the cement industry, Energy Policy, 61, 2013, 1377-1387. (5-year Impact Factor: 3.38)  
  7. Liang, X., Li, J. (2012) Assessing the value of retrofitting cement plants for carbon capture: A case study of a cement plant in Guangdong, China. Energy Conversion and Management 64 (2012) 454–465. (5-year Impact Factor: 3.08)
  8. Li, J., Liang, X, Cockerill, T., Gibbins, J., Reiner, D.M. (2012) Opportunities and Barriers for Implementing CO2 Capture Ready Designs: A Case Study of Stakeholder Perceptions in Guangdong, China. Energy Policy 45, 243-251. (5-year Impact Factor: 3.38)
  9. Li, J., Liang, X. (2011) CO2 Capture Modelling for Pulverised Coal-fired Power Plants: A case study of an existing 1GW ultra-supercritical power plant in Shandong, China. Separation and Purification Technology 98, 138-145. (5-year Impact Factor: 3.53)
  10. Li, J., Liang, X., Cockerill, T. (2011) Getting Ready for Carbon Capture and Storage Through A ‘CCS Ready Hub’: A Case Study Of Shenzhen City In Guangdong Province, China. Energy 36(10), 5916-5924. (5-year Impact Factor: 4.17)
  11. Liang, X., Reiner, D.M., Li, J. (2011) Perceptions of Opinion Leaders towards CCS
  12. Demonstration Projects in China. Applied Energy 88, 1873-1885. (5-year Impact Factor: 4.78)
  13. Liang, X., Reiner, D.M., Gibbins, J., Li, J. (2010) Getting Ready for Carbon Capture and Storage by Issuing Capture Options. Environment and Planning A 6(42), 1286-1307. (5-year Impact Factor: 2.32)
  14. Liang, X., Reiner, D.M., Gibbins, J., Li, J. (2009) Assessing the Value of CO2 Capture Ready in New-build Pulverised Coal-fired Power Plants in China. International Journal of Greenhouse Gas Control 3, 782-792. (5-year Impact Factor: 5.19)

 

  • Book Session   
  1. Sagar Gubbi, Maura C. Lillis, Jia Li, and Pradeep Tharakan (2015), Chapter in Hand book of Clean Energy Systems, Finance and Investments in Renewable Energy in Asia. John Wiley & Sons, Ltd. ISBN: 978-1-118-38858-7.

 

  • Peer-reviewed Reports and Working Papers   
  1. Liang, X., Reiner, D., Gibbins, J., Li, J. (2011) The Economics and Commercial Opportunities of CO2 Capture Readiness (CCR) in Guangdong.UK Foreign and Commonwealth Office (FCO) and Australia Global Carbon Capture and Storage Institute (GCCSI), 33 pages.
  2. Gibbins, J., Chalmers, H., Lucquiaud, M., McGlashan, N., Li, J., Liang, X. (2011) Retrofitting CO2 Capture to Existing Power Plants. IC Consultant Ltd, UK, IEA Environmental Projects Ltd (IEA GHG). 
  3. Liang, X., Reiner, D.M., Gibbins, J., Li, J. (2007) Financing Capture Ready Coal‐fired Power Plants in China by Issuing Capture Options. Electricity Policy Research Group, EPRG Working Paper 0728, University of Cambridge. Available at  http://www.eprg.group.cam.ac.uk/wp‐content/uploads/2008/11/eprg0728.pdf

 

  • Contributions to Conference Proceedings  
  1. Li. J, Deng, G, Tan, X, Yang, H, Gibbins, J., Zhang, Z., Zhu, H., Making a 1GW Ultra-supercritical Coal-fired Power Plant CO2 Capture Ready: A CCR Case Study for a China Resources Power 2x1GW ultra-supercritical power plant. 6th-12th Octorber 2014, Austin, US. Energy Procedia.  
  2. Wetenhall, B., Aghajani, H., Chalmers, H., Benson, S.D., Ferrari, M-C., Li, J.,Race, J.M., Singh, P., Davidson, J.Impact of CO2 impurity on CO2 compression, liquefaction and Transportation. In Proceedings of the12th International Conference on Greenhouse Gas Control (GHGT-12) 6th-12th Octorber 2014, Austin, US. Energy Procedia. 
  3. Wilson, I.  and Li, J. (2014) Low Cost Simplified Design of a Two Stage Plug Flow Gasifier. In proceddings of the 12th International Conference on Combustion and Energy Utilisation, Lancaster, UK.29/Sep/2014-3/Oct/2014. Energy Procedia
  4. Li, J., Liang, X., Gibbins, J. (2012) Early Opportunity for CO2 Capture from Gasification Plants in China. In: Proceedings of the 2nd International Conference on Advances in Energy Engineering (ICAEE) 2011, 27th -28th December 2011, Bangkok, Thailand, Energy Procedia 14, 1451-1457.
  5. Li, J., Cockerill, T., Liang, X., Gibbins, J. (2011) Locating New Coal-fired Power Plants with Carbon Capture Ready Design – A GIS Case Study of Guangdong Province in China. In: Proceedings of the 10th International Conference on Greenhouse Gas Control (GHGT-10), 19th-23rd September 2010, Amsterdam, The Netherlands. Energy Procedia 4, 2824-2830.
  6. Li, J., Gibbins, J.,Cockerill, T., Chalmers, H., Lucquiaud, M., Liang, X. (2011) An assessment of the potential for retrofitting existing coal-fired power plants in China. In: Proceedings of GHGT10- International Conference on Greenhouse Gas Control, 19th-23rd September 2010, Amsterdam, The Netherlands. Energy Procedia 4, 1805-1811.
  7. Li, J., Liang, X., Reiner, D., Gibbins, J., Lucquiaud, M., Chalmers, H. (2011) Financing New Power Plants ‘CCS Ready’ in China – a case study of Shenzhen city. In: Proceedings of the 10th International Conference on Greenhouse Gas Control (GHGT-10), 19th-23rd September 2010, Amsterdam, The Netherlands. Energy Procedia 4, 2572-2579.
  8. Gibbins, J., Chalmers, H., Lucquiaud, M., Li, J., McGlashan, N., Liang, X., Davison, J. (2011) Techno-economic assessment of CO2 capture retrofit to existing power plants.In: Proceedings of the 10th International Conference on Greenhouse Gas Control (GHGT-10), 19th-23rd September 2010, Amsterdam, The Netherlands. Energy Procedia 4, 1835-1842.
  9. Li, J. (2009) Current development of CCS in China.The 3rd Annual European Carbon Capture & Storage Summit. 18-19 November 2009. London. 
  10. Li, J., Gibbins, J. (2009) Theoretical Prospects for Retrofitting CO2 Capture Now and Implementation of CO2 Capture in 2020 and 2030. In: Proceedings of the 8th Annual Conference on Carbon Capture & Sequestration, May 4 -7, 2009, Sheraton Station Square, Pittsburgh, Pennsylvania. 
  11. Li, J., Gibbins, J., Liang, X., Reiner, D.M., Jiang, C. and Liu, X. (2009) Overview of CCS development in China.Proceedings of the 8th Annual Conference on Carbon Capture & Sequestration, May 4 -7, 2009, Sheraton Station Square, Pittsburgh, Pennsylvania.
  12. Gibbins, J., Lucquiaud, M., Chalmers, H., Li, J. (2009) Carbon capture ready (CCR) and upgrade ready power plants. New Build Europe 2009, Munich, Germany, 30th Jun 2009 - 1st Jul 2009. 
  13. Reiner, D.M., Liang, X., Gibbins, J., Li,J. (2008) Assessing the Value of CO2 Capture Ready in New-build Coal-Fired Power Plants in China. In: Proceedings of 9th International Conference on Greenhouse Gas Control Technologies, Washington DC, USA, 16-20 November 2008. Energy Procedia 1, 4363-4370.
  14. Gibbins, J., Lucquiaud, M., Chalmers, H., Li, J. (2008) Retrofitting CO2 capture to capture-ready and other existing power plants: costs, regulations and incentives. Carbon Capture and Storage, 12 November 2008, IMechE, 1 Birdcage Walk, London. 
  15. Gibbins, J., Li, J., Lucquiaud, M. (2007) Technical Options to Make New Pulverised Coal Power Plants Capture-Ready and to Retrofit Capture. In: Proceedings of International Conference on Climate Change, Hong Kong. 
  16. Gibbins, J., Li, J., et al. (2006) Capture ready fossil fuel plants: a critical stage in tackling climate change. In: Proceedings of the 7th European IGCC conference. Barcelona, Spain. April 2006. 
  17. Gibbins, J., Lucquiaud, M., Li, J., Lord, M., Liang, X., Reiner, D.M. (2006) Capture ready fossil fuel plants: definitions, technology options and economics, In: Proceedings of the 8th international conference on greenhouse gas control technologies: GHGT8, 19-22 June 2006, Trondheim, Norway. 

 

  • Book Session
  1. Sagar Gubbi, Maura C. Lillis, Jia Li, and Pradeep Tharakan (2015), Chapter in Hand book of Clean Energy Systems, Finance and Investments in Renewable Energy in Asia. John Wiley & Sons, Ltd. ISBN: 978-1-118-38858-7.

 

学术兼职

  • 2013: 英国高等教育协会会士
  • 2013: IET会员
  • 2011-2012: 英国埃克塞特大学高等教育教师文凭

 

沪交ICP备20170123  © 2017 上海交通大学中英国际低碳学院All Right Reserved